Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13633515

- Product Categories
- Friendly Links
Information Name: | Dongguan factory dormitory renovation preferred Hanting |
Published: | 2014-12-22 |
Validity: | 360 |
Specifications: | |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | Staff quarters plant decoration decoration in general, large-scale, large area, it is important to plant decoration is related to the factory so many people problem, not a personal problem 2, workshops, dormitories, canteens, meeting rooms, offices, reception, etc. etc., are very lines, and little attention will cause irreparable damage to the plant 1. Material -. plant materials should be chosen tightness good, and we should not change in temperature and humidity deformation. Inner wall decoration skeleton structure and additional insulation should be non-combustible or difficult to burn body body 2. The interior light reflection coefficient of each surface material: ceiling and walls should be 0.6-0.8; the ground should be between 0.15 and 0.35. 3. The interior should pastel colors. 4. ground, return air trench and located underground mezzanine technology should be used waterproof or moisture, mold and other measures. Ground to comply with smooth, wear-resistant, easy to clean dust, is not easy to build up static electricity and have a comfort requirements. 5. Building duct and the inner surface decoration standard return air throughout the trench should send, return air system to adapt and be easy to dust 6. plant technology dissection should be plastering the walls and ceiling. 7. To replace the HEPA filters in the technical dissection is increasing brush paint finishes. 8. cleanroom personnel outside the window should be set to double-glazed window with a good metal tightness. 9. toward the closed doors should teach high air cleanliness room clean room opened, should be established on the observation window without windows clean room door. 10, clean room doors, windows, walls, ceiling, and construction of a gap structure (floor) surface, reliable sealing measures should be taken. 12, the interior walls and ceiling surfaces shall comply with smooth, can not afford to ash, dust to avoid glare and ease requirements. While also reducing the convex surface, made of rounded corner of yin and yang. Such as plastering, plastering should adopt advanced standard. |
Admin>>>
You are the 7477 visitor
Copyright © GuangDong ICP No. 10089450, City Hanting Decoration Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7477 visitor
Copyright © GuangDong ICP No. 10089450, City Hanting Decoration Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility